Wirral's gritters are on standby until 5 April 2027, with 10 main routes, four mini gritter routes and 111 grit bins. Main roads should be done within five hours.

Wirral Council’s gritting season is under way and runs until 8am on Monday 5 April 2027. The council’s Director of Operations signed off this winter’s plan on 30 October. The decision was published on 16 November (Wirral Council officer decision 6416).

The season started at 8am on Monday 9 November and lasts 21 weeks. The plan says it can start earlier or run on longer if the weather demands it.

Overview

  • Season: 9 November 2026 to 5 April 2027
  • Routes: 10 main gritting routes and four mini gritter routes
  • Grit bins: 111, checked on 19 October
  • Target: main routes finished three to five hours after gritting starts
  • Salt store: the council’s salt barn at 250 Cleveland Street, Birkenhead

Which roads get gritted

The plan sets out 10 numbered routes for the large gritters, each driven from the Cleveland Street salt barn. Route 1, for example, covers Woodchurch Road, the M53 interchange at Prenton and the road to Arrowe Park Hospital’s main entrance.

Four smaller “mini gritter” routes reach roads the big lorries do not. They include:

  • Holmlands Drive and the roads around it in Prenton, and Fairview Road in Oxton
  • Mill Road, Well Lane and Kings Road in Bebington, and Mill Park Drive in Eastham
  • School Lane in Thurstaston, Observatory Road in Bidston and Bidston Avenue
  • Holland Road, Maitland Road and Dalmorton Road in Wallasey and New Brighton

Landican Cemetery is also gritted by a mini gritter. The council grits its own car parks when instructed.

Pavements are not on the regular routes. They appear, with some extra side roads, on a separate list of carriageways and footways that “may be considered for treatment during prolonged periods of severe weather”.

How fast and how much salt

The contractor, Idverde, supplies the drivers. Its contract requires main routes to be finished between three and five hours after gritting starts. From 23 November to 1 February, each lorry has a second crew member in bad weather.

Salt goes down at different rates depending on the forecast:

Conditions Salt per square metre
Frost or light snow expected 10g
Freezing after rain up to 25g
Continuous snow forecast 25g to 40g

Ploughing starts once snow is more than 3cm to 4cm deep, according to the plan.

When the council would cut back

The plan defines severe weather as temperatures staying below zero for 72 hours, or more than 2cm of snow lying across half of Wirral. In a long spell like that, salt or fuel could run short.

If that happens, the council says it will keep gritting but may treat fewer roads, use less salt per square metre or switch to other materials. What gets treated would depend on the road hierarchy and the impact on people and traffic, the plan says.

New this year is a “Winter Impact Protocol”. It lets senior highways officers form a panel during a bad spell of snow or ice to decide whether to go beyond normal gritting. The panel reports to the Director of Operations.

Where the grit bins are

The plan lists 111 grit bins, by street and ward, checked for condition and stock on 19 October. The wards with the most are:

  • Heswall: 23
  • West Kirby and Thurstaston: 13
  • Bebington: 9

The council says bins will be checked again after severe or long cold spells and refilled where needed, “subject to priority and available resources”.

What it means for you

  • Routes are chosen by risk. The council’s winter service strategy puts access for emergency services and hospitals, public transport routes and access to stations and bus depots among the factors. Your own street may not be on a route.
  • Pavements are not gritted routinely. They are only considered in prolonged severe weather.
  • On a frosty early morning, the main routes can take three to five hours to finish once gritting starts.